Parssakhtar at a glance

Pars Sakhtar Company, with a history of almost four decades of activity in the country's industry, is the only EPC company in the northwest of Iran that completes design operations, supplies equipment and machinery, participates in industrial and mining projects, manufactures and installs all kinds of projects. Single-base concrete and steel masts for distribution and transmission of electric power and telecommunications masts, construction of high voltage substations, construction and renovation of power plants, design, equipping and construction of factories for the production of various steel chain products, heavy metal structures with Application in various industries, heavy halls with high span as asymmetric and special coatings, hydromechanical equipment of factories, overhead cranes up to 150 tons, industrial tools and machines, ancillary industrial facilities, engineering and implementation of structures and facilities and equipment of modern glass and plastic greenhouses , managing and performing contracting related to facilities and equipment in industries and factories. Some of the records of Pars Sakhtar company are presented below:

Established and started working since 1363 until now

Obtaining the first qualification certificate for basic contracting of an energy field outside of Tehran

The only EPC company working in the northwest of the country

The only company qualified by Tawanir to produce all three types of masts (concrete self-standing, steel telescopic and steel mesh)

Having a national and international patent for self-standing concrete towers

Implementation of more than 150 projects of line, post and power plant construction

Implementation of more than 2,000 kilometers of power transmission and distribution lines

Export of technical and engineering services worth more than 10 million dollars

About Pars Structure Company

1363
1363

Pars Structure Company was established in 1363 as the first company and the oldest rank one contractor in the power sector. This company is the only one authorized to produce all three types of power transmission towers from Tawanir in the country.

1373
1373

The first transmission line by this group through concrete masts in the form of a 230 kV two-circuit transmission line in 130 km from the origin of the Khoi power plant to the 230 kV Balanj substation in Urmia, started with the efforts of colleagues in 1973 and almost at the predicted time with Success is over.

2010
2010

For the first time in 2010, this group succeeded in inventing high voltage concrete masts and designing and implementing its special connections, which ultimately led to the internal registration of this invention.

2011
2011

After registering a global patent, this design has won the first place in the World Olympiad of Applied Structures Inventions in Geneva.